Quilt ADD in therapy

My photo
Colorado, United States
Other than my family, the passion of my life is quilting. An eclectic, I love a wide variety of styles and techniques encompassing both machine and hand work. I am a longarm quilter who can work for you. I enjoy any style, from pantographs to all-over to full custom, ranging from traditional to modern. I love bringing vintage tops to life and am willing to work with a challenging quilt top. Instagram: lyncc_quilts
Showing posts with label Finish Parties. Show all posts
Showing posts with label Finish Parties. Show all posts

Friday, March 19, 2021

March OMG Finish - Window 1

 Yes!  

My first window's valance is FINALLY finished and mounted! 




It's only been in the works for like two years. . .   ::sigh::



I *love* the fabrics. I worried that the turquoise embroidery would be a little weird in the cerulean blue room, but it's spot on with its cheeriness! And the texture of the lining fabric is perfect in the room. And then I also worried about the blush pink shantung silk tabs - was it too much of a pop for the room?



I intended their color to play with the pink-family tones in the floral oil painting I have by the sinks (and the floral arrangement between the sinks and the garden tub). I worried right up until it was finally hung and I stepped back and saw: Happiness.  :)   My ideas came together the way I'd pictured in my mind.



There's a lesson in that: Often as we're working, the components of what we're doing don't seem like they're playing the way we want them to. But in quilting (and décor) the sum of the whole is frequently more than the value of the parts alone, and if you persevere, the end result is terrific. It's hard to trust in that, though, when you also know that sometimes you just end up with a hot mess.


The problem with this project was - - - the upholstery grade fabrics are too much for my sewing machine to handle once you get multiple layers going. So all the header sewing has to be done by hand. It's not fun, even with the correct needle for the job. And we're talking a 64" header! It's hard to push through everything, and even with a thimble it does a number on my finger. So I found it extremely easy to continuously shunt the work aside and do bindings or hand applique, instead, each evening. It took an OMG assignment to get it done.

And now that the first one is finished and up, I have motivation to stitch the heading and tabs onto the second one without resorting to using a quilt's OMG spot to make myself do the work.  ;D

I love this room. It's a good thing I'm the one who pays the water bill each month, or I'd be lounging and reading in here every day. . . 



(Oh - if you're sharp-eyed and wondering about that painter's tape in the middle of my window frames, it's there to remind me that as soon as it's warm enough to open windows to work with smelly things that exacerbate my Lupus, I need to repaint the sashing that was marred when the middle broken window was replaced. Flying shrapnel from another project destroyed that glass - lucky it wasn't a person that it hit!)

Thursday, December 7, 2017

18 in 2018 and UFO Challenge 2018

Here’s my 2018 list of projects I want most to advance. It is doubling for Judy's UFO challenge and the 18 in 2018 challenge.

(There will be other projects worked on during the year, but these are the ones I do not want left behind any more.)


The first twelve, in no particular order, are slated for Judy’s monthly UFO Challenge:

FINISHED 1. Fancy Forest. This quilt is basted and loaded on zippers for the longarm. It will get full-custom quilting. I pieced the top from June to August of 2016, basted it November 2017.   <<First two stages of quilting finished in February, background finished first week of March. Binding finished Mar 28, 2018.>>


2. Coral Encounter. This flimsy needs to be quilted. I started it at a Judy Niemeyer workshop in February 2012, and finished it that August.



3. Quiet Rebellion on the Pond. This flimsy needs to be quilted.  I made it in August 2012, as a “my own way” approach to a guild challenge from December 2010.



4. Hearts for Kelly. This flimsy needs to be quilted. Everyone in our family contributed to this top in May 2010. We were making it quickly to send to Kelly when she had a stroke (44 years old, dealing with cardiomyopathy), but she died soon after the stroke. L I haven’t had the heart to finish it until now.



On the frame next 5. Devon’s Quilt. This quilt from 2016 was partially quilted on my domestic machine, and needs to be finished on the longarm. It stalled partly because of technique intimidation and because I had to sew Renaissance gear for 18 people. <<Mar UFO 2018.>>




6. Leaded Glass. This flimsy needs to be quilted. It was made at the Cabin Fever Retreat, March 2015.



7. Once Upon a Star. This flimsy with trapunto work needs its full-sheet quilting done. Most of the applique work was done and the flimsy put together in November 2012. It had been idle since 2010 at that point.



FINISHED 8. Mermaid Fantasy for Heather. Another flimsy with trapunto work that needs its full-sheet quilting. This was originally started in December 2008, I believe. The trapunto work was done in November 2017.   <<Number drawn for March. Completely finished Mar 30, 2018.>>



9. Plums in November. Another quilt partially done at the domestic that needs to go on the longarm to be finished. In November 2013, I made this top from a kit that had been in my storage from some time before spring 2012.



FINISHED 12. 10. (because I don't have the longarm skill set yet to do what is now 12, and 10 is first up for the Elm Street Challenge)   BohemiaThis flimsy needs to be quilted. I purchased its kit in January 2014 and put the top together that month. <<Quilted in January on schedule, and completely finished, including hanging sleeve, Feb 8, 2018.>>




11. Sew Spooky. Another one partially quilted at the domestic that needs finishing on the longarm. It’s even on zippers right now! The quilt top was made in Oct and Nov 2014, and then the domestic quilting was done in February 2016. In Oct 2017, I took all the pins out, and prepped it for the longarm.



12. Set Sail. This flimsy needs to be quilted. It was a kit I purchased from Quilting By the Bay in Panama City, Florida in 2011. The center was constructed July-August 2013, and the borders were constructed in July 2017.





Six additional UFOs are slated with the preceding projects for my 18 in 2018 goal. This is an extension of Meredith and Anne's former 2017 challenge, and will be hosted here this year. They are hosting 6 & 6 for 2018 for those who want to pull in new projects. I'll be playing over there, as well.  :) 

13. Dear Jane. This flimsy needs to be quilted. It is definitely on the Top-10 list for this year, but it goes in this part of the list because I know it will take more than a month to finish, and I will be putting it on and taking it off the longarm between other projects to keep the work from becoming oppressive. It will get intensive custom quilting. The top was started on August 21, 2011 and finished on August 13, 2013 - right on time for the schedule I’d set of 10 blocks per month. It has 5139 pieces! The blocks are tiny and intricate. It’s insane, and I loved doing it. I’ve put its quilting off until I developed enough skill to do what I wanted to do. I’m not 100% there yet, but It’s Time to finish this lady! Deana and I are going to spur each other to gets our Janes quilted. Aiming for an April start.



14. Modernology. This flimsy needs to be quilted. The top was pieced December 2013 – August 2014.



15. Listen With Your Eyes. This project needs to be pieced. It was started in October 2011 at a Jacqueline DeJong workshop at Quilting By the Bay in Panama City, Florida. After a few weeks of work, it sat idle in a gorgeous chest drawer for six years, until I finished the New York Beauty blocks in November 2017.



16. Let’s Build a Snowman. This project needs blanket stitching on all the fused pieces. The applique work was done in December 2012, from a kit I’d purchased at Christmastime in either 2010 or 2009. I had to supplement and replace many fabrics from my own stash.



17. Kashmir. This project needs to have its blocks made. It was a kit purchased in August 2012. I got as far as washing and cutting the fabrics, then it was boxed so we could move.



18. Wind in the Whiskers. This project needs to have its fused applique work completed for blocks 3-7. This was started at the end of October 2014 and worked on fairly regularly through February 2015. Some more work was done June – Aug 2015, and then it sat. Because the pattern is horrid. A tiny work was done in March 2017 before it was picked up again in December. I intend to keep this on my regular BOM rotation until it is a flimsy. Hopefully that can happen before 2018 is over!



So I have 14 quilts that I want to finish completely, and 4 more quilts that I want to at least advance a stage. 

I also hope to “activate” one NETY each month from my deep storage, and none of my BOM projects are on this list. They will advance as normal around my priority work.



~*~*~  Linking at:

Patchwork Times UFO Challenge 2018
What a Hoot Quilts 18 in 2018

Sunday, April 2, 2017

Q2 Finish-Along Prospects

It's that time - the link-up for our Q2 lists of potential finishes is open this week.

I'm posting my list of projects that I intend to finish by the end of June, along with some extras that would be really nice to finish as well. There's not a small quilt in sight - all are large wall quilt to queen size, so it's good that several are already partly quilted!

The Big Five:

Lori's Aliya - marks are chalked in, ready to pin baste and start quilting this unique commission! 

There are times that my acrylic overlay sheet
is my favorite item in the world

Sew Spooky - it's probably half-way quilted, so high time it gets finished up. I want it on the wall this October, without fail.


Plums in November - quilting is started, just need to develop how I want to do a plummy-leafy feather treatment along the braids. . . 


Devon's Quilt - huge project, but the center is all quilted. Ready to figure out the quilting for the outer borders and get that done up.


Firehouse 1 - Flimsy state, this is a community service quilt


Icing on the Cake:

Rainbow Jane - Boy, do I want this finished after it's waited literally years for a turn. I have a quilting template developed for the spacer triangles. Lots of marking before this can be layered and basted. 


Leaded Glass - one of my favorite Flimsies, but I'm still not convinced I don't want to pull the outer edges off...


Mermaid Fantasy - needs some trapunto work, then quilting


Modernology - probably my very favorite Flimsy, and I even have a scrumptious lemonade backing for it.


String of Pearls - this is a no-brainer, even, because I want to quilt it up just like Christa did. So why wasn't it done up ages ago?


So that's my Q2 proposal list. Hopefully I'll have 6 finished quilts to enter at the end of June!

And for streamlining's sake, here is my
March Report/April Plan:

March - I am almost back into my full groove after the long wedding escapade and gigantic Lupus flare knocked me out of quilting for about 8 months. 

UFO work:  I got 2 items on my 17 for 2017 list squared away (completely finished "Scott's Air Force Retirement" and moved "You Must Be Croaking" from partially done up blocks to full Flimsy status). So that's 3 off the list so far. I made good progress on the next one, which is slated for a complete finish in the next three weeks and has the Priority slot in my work load.

BOM work: BOMs Away Monday is back up and running!!  I reacquainted myself with each of the BOMs on my rotation list and got "Fall All Around" washed, ironed, kitted, and started for the empty slot. Then, after weeks of resisting, I caved and bought a 1/2 yard bundle of the new "Sugar Pie" fabric collection and several pieces of "Grunge" to join in on Sarah Fielke's "Down the Rabbit Hole" BOM. I am almost finished sewing the month 2 portion.

Hand work: Fiesta Mexico is finally moving along! I stitch on this almost every evening during the show Scott and I watch after dinner.

NETY prep: I pulled "Big Sister, Little Sister" out of the deep storage of not-even-touched-yet old kits and got it washed and ironed. Did not get it kitted by month's end.

Community Sewing: I haven't yet gotten back into the rhythm of adding this to my personal sewing.

April - Get 2 projects off the 17 for 2017 list. Stay in my groove of Mon-Thur being dedicated to the priority project, with evening hand stitching and Free Fridays for whatever I want to do. Saturdays I'd like to get back to prioritizing community sewing, and keep Sundays rolling for BOMs and the link-up. Get caught up with the NETY work so there's one processed per month. And for cryin' out loud, finish cleaning the last of the storage room pull-out that's on the pool table. :D

Oh, yeah! - attend that APQS roadshow to figure out which longarm and what setup I want to buy later in the year.

Priority Work: "Lori's Aliya" followed by "Stepping Stones" and then "Sew Spooky"

Thursday, October 1, 2015

Finish Along - Quarter 4 Goal Post

2015 FAL at On the Windy Side

It's that time - if you're participating, don't forget to make a Fourth Quarter "goal" sheet. The 2015 quarterly Finish-Along is hosted by Adrianne over at "On the Windy Side."


Quarter 3 went great for me in terms of finishes. I can only share half of them with you, though. A month from now you'll get all kinds of finish reports - like 7 to 9 of them!  ;D

Here's what I can post right now.  I got all three of these "Sea Breeze" UFOs finished:


And another UFO slipped into the finishes unexpectedly when I quilted up Kelly's "Be Attitudes" top for her nephew's wedding gift. 


Then there was the stash-limited baby quilt for Catey's little guy. (Oh, but it wasn't on my goal post, so it's not an actual Finish-Along entry):


But the star finish of the quarter was Kyle's Marine Corps quilt:



Now for this quarter's attention:

1. Devon & Kyle SID work in progress  :D
This one gets top priority. Time to "pin down" the design of quilting for the outer area and get the top marked for the intense heirloom quilting it will get!! I do doubt that this will be a Q4 finish, but just in case. . . it's here on the list. More likely, you'll see it finished in 2016's first quarter. It's very intense work, and I want my best in it. Means I have to take mental breaks periodically from its needs.


Here's how I work, by the way: Mon-Fri, my quilting time is devoted to the priority finish (and right now, a certain deadline batch of work.) On Saturdays, any quilting work tends to be just whatever the heck floats my boat - which is where UFOs and other choices from below come in. Sundays, I work on scheduled BOMs. Unless, like that last week in Sept, I let the Saturday work hijack Sunday as well. Weekends often get little to no quilting, though, as I love doing things with my family.j[

These Henry Glass pieces are on deadline for October. Right now they are flimsies:

2. Secret Kitty Titty Power - this is a flimsy right now Finished
3. Secret Kitty Shuffle - this is all cut out Finished
4. Secret Soft Kitty, Warm Kitty- this is a flimsy right now Finished
5. Secret Selvages Minis Finished

**UFOs**

6, 7, 8. Sea Breeze minis - The last three flimsies from this series need finishing to round out the full set! I enjoy the trapunto work on them.

"The Nerdles" Finished

"Tootsie and Rumples" and "The Doodles"

And I really think I might get finished this quarter with Kelly's old BOM that I'm quilting for her: 

"Strolling the Block" Finished


Other UFOs that could stand to be zapped off the list this quarter:

Mermaid Fantasy



Marissa's Frog Quilt, which I don't have any photos for. It needs the last border attached and to be quilted.



And this one that the whole family had helped piece, originally meant to be a comfort quilt for Kelly when she was admitted to the hospital (but she didn't survive). After 5+ years, it may just be the perfect top to become a comfort quilt for a good friend going through a very scary time:


~*~*~

**Community Service Quilt**

This one is a full flimsy now, and should be finished by end of November:



I would LOVE to get these season-appropriate tops quilted:

Sew Spooky: SID work finished, needs FMQ


Plums in November
This is going to get silk batting.  :)

Salt Box Harvest

Once Upon a Star

Holiday Tidings



Holly Jolly Snowman


As well as these non-seasonal personal favorites - 

Modernology:


Quiet Rebellion on the Pond

and 

Rainbow Jane:


and even these two if I find money for sending them out:

Daisy, Daisy


Starry-Eyed Over Grand Illusion

That's a crazy insane list, and obviously they won't all be finished this quarter! I'm expecting no less than 4 finishes, hoping for 7 or 8.  But the whole object of these Finish-Along quarter's intentions quilt is to greatly over-list upcoming work so that suprises can count for the drawings at the end-of-quarter linky.

Plus, I just like seeing the fantastic variety of projects I get to play with!!