Quilt ADD in therapy

My photo
Colorado, United States
Other than my family, the passion of my life is quilting. An eclectic, I love a wide variety of styles and techniques encompassing both machine and hand work. I am a longarm quilter who can work for you. I enjoy any style, from pantographs to all-over to full custom, ranging from traditional to modern. I love bringing vintage tops to life and am willing to work with a challenging quilt top. Instagram: lyncc_quilts

Sunday, December 27, 2020

BOMs Away - Down the Rabbit Hole, Water Reflections

 


Welcome to the Link-up for BOMs Away Mondays!

Where we share what we're doing on a BOM type project
so they don't stall out in UFO-land!
(Linky at the bottom)


Yay! I stitched down the two remaining large leaping rabbits:


They're each about as big as our cat, actually! And it still tripped me out how long it took to stitch them. Four and a half hours for both.

My big working table has been hijacked by my Amaya collage quilt project, pushed partially aside for the holiday weekend for Scott's work, so I couldn't get the four standing rabbits set onto the other borders or figure out which fabrics I want to use for the various flowers around all the rabbits. . . 

So, I got a head start on the Month 6 piecing work for next weekend's BOM, Water Reflections:


Time to make all the filler portions and put the blocks and center medallion all together!

I hope you had a decent Christmas. Ours was very quiet with just the two of us, but man, that ham was good! I ordered one from a local ranch and the reputation did not lie - that was the best ham I've ever had. Store hams will never be real to me after this.

~*~*~*~

Have you been able to do any BOM type work lately? We'd love to see it.  :)

Kate over at Katie Mae Quilts has joined me in hosting this meet-up, 
and linking up from either end puts you on the party at both sides.


You are invited to the Inlinkz link party!

Click here to enter

Sunday, December 20, 2020

BOMs Away - Forever My Valentine

 


Welcome to the Link-up for BOMs Away Mondays!

Where we share what we're doing on a BOM type project
so they don't stall out in UFO-land!
(Linky at the bottom)


This weekend I had some fun working more on these four blocks from Forever My Valentine (they are 16-inch blocks):



I've fixed the link-up code so it won't close early this time - back to being open all week!

I hope you have a happy Christmas!

~*~*~*~

Have you been able to do any BOM type work lately? We'd love to see it.  :)

Kate over at Katie Mae Quilts has joined me in hosting this meet-up, 
and linking up from either end puts you on the party at both sides.


You are invited to the Inlinkz link party!

Click here to enter

Sunday, December 13, 2020

BOMs Away - Reflections & Rabbits

 


Welcome to the Link-up for BOMs Away Mondays!

Where we share what we're doing on a BOM type project
so they don't stall out in UFO-land!
(Linky at the bottom)


Wow! My work energy is SIGNIFICANTLY improved as compared to 3 weeks ago, when I last worked on the month 5 sewing for my Water Reflections BOM.  (At least for sit-down work. I still get ridiculously winded when I do anything standing, let alone involving stairs. . . )

First I made the remaining patches, 

Which, added to the ones made last time around, grew up to become these sets of blocks,

And with top/bottom rows of random squares, became the quilt center:


I had no idea I'd be able to finish that much work, so I'm a super happy BOM camper right now.

Also, during the work week I snuck in time to do more on the leaping rabbits from last weekend, because all those little pieces that took forever to sort out and organize were out on my table - not to be trusted as safe, with Navarre around! (Plus, I wanted that mess cleared away.)


So now, two leaping rabbits are completely stitched, and the other two are all glued on, ready for stitching when that BOM's turn comes up again. (The photo above shows correct colors. These guys below didn't stay true with night-time lighting.)



My work-week priority project is not a Christmas quilt, but the colors in these blocks sure are perfect for December attention, aren't they? 


They make me happy.  They'll grow up this week to become the Jinny Beyer "Kashmir" quilt top. I really need to start blogging all my work again, instead of just the weekend BOM times. . . 


~*~*~*~

Have you been able to do any BOM type work lately? We'd love to see it.  :)

Kate over at Katie Mae Quilts has joined me in hosting this meet-up, 
and linking up from either end puts you on the party at both sides.



You are invited to the Inlinkz link party!

Click here to enter

Sunday, December 6, 2020

BOMs Away - Pulling out an Oldie but Goodie

 


Welcome to the Link-up for BOMs Away Mondays!

Where we share what we're doing on a BOM type project
so they don't stall out in UFO-land!
(Linky at the bottom)


Whoa! I knew it had been quite a while since I'd worked on my Down the Rabbit Hole BOM, but I looked it up just now, and that project has been stalled since MARCH 2018, when I had prepped the rabbit pieces for the next border work. 


As deeply in love as I am with needle-turn hand stitch applique, I detest machine applique work - which is largely why this got shelved for so long. Also, it makes my head explode, figuring out how to adjust this round and the last round to make the quilt a king size instead of a queen.

Four and half hours later today, The first leaping rabbit is finished! So cute! 

These rabbits are quite large - you can see better perpective in this pic I'd taken when I was prepping the pieces. I'm using the edge-turn on freezer paper method for these, with a tiny blanket stitch using 50wt aurifil thread to sew them down.

 

Looking at my finished guy, I think I'll draw up some eye pieces and add those in when I do the next rabbit, rather than embroidering them on.

This is a Sarah Fielke design, and was her 2017 BOM program. Here is her finished quilt:


 I was doing mine in Easter colors, and had this much finished when I putzed out on it:


Now I intend to keep it on my active BOM list until it is finished! That means I have Water Reflections, Forever My Valentine, and Down the Rabbit Hole on rotation for weekend work to give me breathers from my priority piecing and quilting. 

~*~*~*~

Have you been able to do any BOM type work lately? We'd love to see it.  :)

Kate over at Katie Mae Quilts has joined me in hosting this meet-up, 
and linking up from either end puts you on the party at both sides.


You are invited to the Inlinkz link party!

Click here to enter